(Cumulative total = RM 176,000, no of grants = 7)
2018
Q.K130000.2640.15J03 |
The Value of Historic Urban Landscape Elements Influence the Character of George Town UNESCO World Heritage Site |
1/2/2018 |
31/1/2019 |
20,000.00 |
Q.J130000.2522.19H54 |
Framework of Contractor’s Performance Appraisal for Government Construction Project in Malaysia |
4/1/2014 |
31/03/2016 |
50,000.00 |
2017
R.K130000.7740.4J296 |
Framework of Governance on Urban Heritage: Adaptive Reuse of Heritage Buildings |
1/8/2017 |
7/31/2019 |
32,000.00 |
R.K130000.7740.4J298 |
Street Design Guidelines for Safety Improvement in Kuala Lumpur |
1/8/2017 |
7/31/2019 |
32,000.00 |
R.K130000.7740.4J290 |
Contractor Selection Framework for Public Projects in the Malaysian Construction Industry |
1/8/2017 |
7/31/2019 |
32,000.00 |
R.K130000.7740.4J294 |
International Collaborative Research and Development of Occupational Safety and Health Ecosystem for the Ministry of Human Development and Labor, Khartoum State |
1/8/2017 |
7/31/2019 |
32,000.00 |
2016
Q.J130000.2605.12J08 |
Framework of Change Management in the Malaysian Government Organisation |
01/10/2016 |
31/12/2017 |
20,000.00 |
Q.K130000.2640.12J00 |
A Framework on Water Sensitive Cities: Holistic Applications of Stormwater Management |
01/10/2016 |
31/12/2017 |
20,000.00 |
Q.K130000.2640.11J98 |
Framework of Communication Management Improvement in the Malaysian Architectural Firms |
01/10/2016 |
31/12/2017 |
20,000.00 |
2015
Q.K130000.2640.09J76 |
The Tension Stiffening Mechanism in Reinforced Fiber Concrete Members |
4/1/14 |
6/30/2015 |
20,000.00 |
2014
R.J130000.7810.4L815 |
Creating An Eco-System for Real Estate and IP Waqf at Universities in Malaysia |
01/01/2014 |
6/30/2017 |
100,140.84 |
Q.J130000.2510.06H57 |
Housing Affordability Index In Malaysia |
4/1/14 |
31/03/2016 |
36,088.00 |
Q.K130000.2640.09J76 |
The Tension Stiffening Mechanism in Reinforced Fiber Concrete Members |
4/1/14 |
6/30/2015 |
20,000.00 |
2013-2011
Q.K130000.2540.03H87 |
Construction On-site Productivity Constraints and Improvement Measures: A Framework for Malaysian Construction Industry |
1/12/2012 |
31/12/2014 |
120,000.00 |
Q.K130000.2740.00K40 |
Assessing the Role of Density on Influencing the Level of Sociability in Urban Neighbourhoods for Livable City |
1/6/2013 |
31/5/2014 |
20,000.00 |
R.K130000.7740.4J084 |
Long-Term Distribution of the Extreme Values of Offshore Structural Response by Modified Finite-Memory Nonlinear System Modeling |
1/9/2012 |
28/2/2014 |
50,000.00 |
R.K130000.7740.4J085 |
Derivation of Short-term Probability of the Extreme Values of Offshore Structural Response by an Efficient Time Simulation and Finite-Memory Nonlinear System Techniques |
1/9/2012 |
28/2/2014 |
50,000.00 |
Q.K130000.2640.06J89 |
Comparison of Probability Distributions of the Extreme Response Values from Different Methods of Simulation Wave Kinematics |
1/12/2012 |
31/12/2013 |
34,000.00 |
Q.K130000.2640.07J02 |
Derivation of Long-term Probability Distribution of the Extreme Values of Offshore Structural Response by an Efficient Time Simulation Techniques. |
1/12/2012 |
31/12/2013 |
34,000.00 |
Q.K130000.2540.00H47 |
A Causal Relationship Framework for Success Determinants and Success Criteria of Social Infrastructure In Malaysia |
1/4/2011 |
31/3/2013 |
150,000.00 |
Q.K130000.2640.03J27 |
Evaluating the Implementation Effectiveness of Crime Prevention Through Environmental Design (CPTED) in the Design And Planning of Kuala Lumpur by Kuala Lumpur City Hall |
1/4/2011 |
31/3/2012 |
40,000.00 |
Q.K130000.2840.00L06 |
Pembangunan Buku Panduan Penilaian dan Pemarkahan Makmal dan Bengkel Kejuruteraan UTM Razak School of Engineering and Advanced Technology |
01/09/2011 |
31/08/2012 |
10,000.00 |
R.K130000.7708.3T133 |
Key Performance Indicators (KPIs) of Malaysia’s Construction Industry |
15/12/2009 |
14/6/2011 |
40,000.00 |